Layout record
Provide a dimensioned venue plan, usable floor area, ceiling or obstruction information, entries and desired activity zones. State one unit system and drawing revision. The supplier's layout proposal remains subject to project-team review.
Equipment record
List trampoline dimensions, mat and spring or elastic approach, frame, pads, netting, access modules and any specialty activities. Ask for material descriptions, component identifiers, proposed drawings and exact-scope documents; do not infer a safety outcome.
Packaging confirmation
Request a module-level packing list, carton or crate dimensions, weights, marks and spare-parts allocation. Ask which items ship loose and how drawing identifiers correspond to packages.
Installation boundary
Separate design files, remote guidance, on-site supervision, installer labor, tools, anchors, building work, inspections and handover. Local site conditions and applicable requirements need qualified review.
Choose a budget basis before comparison: currency, range and whether it covers equipment only or the whole order. A budget option may simplify finish or support scope, while a higher-service proposal may include more drawing or supervision work. Compare both against the same mandatory configuration; preference labels are not audited supplier ratings.